CIMPOR Global Holdings
Ericsson ↗Vendor case studyLocation in source: Intro under H1Checked Sep 30, 2026Source date: not stated
Reported deployment
A Ericsson case study; outcomes are vendor-reported and not independent measurements.
Involved in this project? Suggest a correctionInvolved in this project?
Correct the details, or tell us what has changed since it was reported. Use your company email and confirm it, and you’re reviewed first.
Suggest a correctionAnyone can send a correction; we check each one against its sources.
Cement maker CIMPOR has private 5G networks at its Alhandra, Souselas and Loulé plants in Portugal, built with Vodafone Portugal and Ericsson.[1] The first, at Alhandra, was announced in December 2024 as Portugal's first 5G standalone private network, and coverage of all three plants was reported in January 2026.[2][3] Vodafone provided the spectrum, network design and managed services, while Ericsson supplied the core and radio access network (RAN).[1] Ericsson's 2026 case study says the networks link more than 10,000 sensors and that CIMPOR has since awarded the two companies a fourth site.[1]
As reported by the sources below; not independently verified.
CIMPOR's private 5G is reported live at Alhandra, Loulé and Souselas.[3][4]
Ericsson publishes a case study saying CIMPOR has awarded a fourth site.[1]
Ericsson and Vodafone Portugal announce a 5G SA private network at CIMPOR's Alhandra plant and say two more plants will follow.[2][5]
CIMPOR signs a 10-year extendable contract with Vodafone Portugal.[3]
This record keeps the source's anonymous customer label and reported status. A case study does not establish current operation, reproducible performance, or independent verification.
Researched Oct 1, 2026. Manufacturer and vendor statements are their claims, not independent tests.
Every detail in the table at the top comes from these sources. Open the source details for each fact’s publisher, evidence type, date, and where it appears.
CIMPOR Global Holdings
Ericsson ↗Vendor case studyLocation in source: Intro under H1Checked Sep 30, 2026Source date: not stated
cement manufacturing
Ericsson ↗Vendor case studyLocation in source: Intro under H1Checked Sep 30, 2026Source date: not stated
Portugal (Alhandra, Souselas and Loulé plants)
Ericsson ↗Vendor case studyLocation in source: 'The solution: Private 5G built for industrial-scale manufacturing'Checked Sep 30, 2026Source date: not stated
deployed
Ericsson ↗Vendor case studyLocation in source: 'The solution: Private 5G built for industrial-scale manufacturing'Checked Sep 30, 2026Source date: not stated
predictive maintenance sensors, drone inspections, AR remote assistance, paperless mobile operations
Ericsson ↗Vendor case studyLocation in source: Intro under H1Checked Sep 30, 2026Source date: not stated
Vodafone Portugal; Ericsson
Ericsson ↗Vendor case studyLocation in source: Intro under H1Checked Sep 30, 2026Source date: not stated